Notice of Waste Water Bypassing - Longlac & Geraldton (Re-Issued)

Notice of Bypassing on September 22, 2017  - The Geraldton Waste Water Treatment Facility and the Picnic Point Lift Station in Longlac are in a state of bypassing due to the rainfall event of today.

__________________________________________________________________________

UPDATE September 18, 2017 

The Geraldton Waste Water Treatment Facility reported a bypass event that began on September 17 and ended on September 18, 2017.  Bypassing occurred as a result of heavy rainfall.  

During the same rainfall event, bypassing at the Longlac Waste Water Treatment Facility and lift stations reported on September 16, ended on September 18, 2017.  Read more...

___________________________________________________________________________

September 16, 2017 at 2:30 pm - The Longlac Waste Water Treatment facility and lift stations are currently in a state of bypassing due to high rainfall levels.  

Saturday, September 16, 2017